How to Use
- Choose the footing type - Select a continuous strip, rectangular pad, or round pier/post footing.
- Enter approved dimensions - Use dimensions from the plan, engineer, or local building authority; this calculator does not design the footing.
- Enter quantity and waste - Count identical footings and choose an overage for excavation variation, spillage, and measurement uncertainty.
- Confirm the bag yield - Use a common preset or enter the mixed yield printed on the concrete bag.
- Review the order estimate - Compare cubic yards, bag counts, per-footing volume, waste, conversions, and optional supply pricing.
A 20 ft continuous footing that is 16 in wide and 8 in thick uses about 0.66 yd³ before waste, or about 0.72 yd³ and 33 standard 80 lb bags with 10% overage. A 12 in diameter round pier that is 36 in deep uses about 0.087 yd³ before waste, or 5 standard 80 lb bags with 10% overage. Select the footing geometry above and enter the dimensions required by your approved plan.
Concrete Footing Volume Formulas
The calculator first finds the volume of one footing, multiplies by the number of identical footings, and then adds the selected waste allowance:
Rectangular / square pad = Length × width × concrete thickness
Round pier or post footing = π × (diameter ÷ 2)² × concrete depth
Round footing with post deduction = π × [(hole radius)² − (post radius)²] × concrete depth
Project total = Volume per footing × quantity
Concrete to order = Project volume × (1 + waste percentage)
Cubic yards = Cubic feet ÷ 27
Bag count = Concrete to order ÷ mixed yield per bag, rounded up
The excavation depth below grade is not automatically the concrete thickness. Enter the actual concrete dimensions shown on the project details.
Material Estimate, Not Footing Design
This calculator estimates concrete for dimensions you already know. It does not determine the required footing width, thickness, depth below grade, pier spacing, soil bearing capacity, structural load capacity, frost protection, or reinforcement.
Use dimensions from approved plans or confirm them with the local building authority or a qualified professional. Local requirements can vary with climate, soil, structure, and the code adopted by the jurisdiction.
Common Concrete Bag Yields
Bag weight does not replace the product yield printed on the package. These presets match the approximate mixed yields published for standard QUIKRETE Concrete Mix; specialty and high-yield products can differ:
| Bag Size | Approximate Mixed Yield | Approximate Liters |
|---|---|---|
| 40 lb (18.1 kg) | 0.30 ft³ | 8.5 L |
| 50 lb (22.7 kg) | 0.375 ft³ | 10.6 L |
| 60 lb (27.2 kg) | 0.45 ft³ | 12.7 L |
| 80 lb (36.3 kg) | 0.60 ft³ | 17 L |
Use the custom-yield option when the selected product label gives a different mixed volume. The calculator always rounds the purchase quantity up to whole bags.
How to Measure Each Footing Type
Continuous or strip footing: enter the total concrete run length, the footing width, and the concrete thickness. Do not use trench depth below grade as the concrete thickness unless the footing detail actually calls for concrete through that full depth.
Rectangular or square pad: enter the pad length, pad width, and concrete thickness. Use the quantity field for identical isolated pads.
Round pier or post footing: enter the inside diameter of the hole or form and the concrete depth. Leave post deduction off unless a post occupies part of the concrete volume. For cardboard form-tube planning, the sonotube calculator remains the specialist tool.
For irregular excavations, measure several locations and use a reasonable waste allowance. Soil collapse, loose sides, over-excavation, spillage, and material left in the mixer can all increase the amount required.
Worked Quantity Examples
| Known Dimensions | Quantity | Base Volume | With 10% Waste | 80 lb Bags |
|---|---|---|---|---|
| Strip: 20 ft × 16 in × 8 in | 1 run | 0.658 yd³ | 0.724 yd³ | 33 |
| Pad: 3 ft × 3 ft × 12 in | 4 pads | 1.333 yd³ | 1.467 yd³ | 66 |
| Round: 12 in diameter × 36 in deep | 6 piers | 0.524 yd³ | 0.576 yd³ | 26 |
| Round: 10 in diameter × 36 in deep | 10 piers | 0.606 yd³ | 0.667 yd³ | 30 |
These examples estimate material for the stated dimensions; they are not footing-size recommendations. Bag counts use 0.60 ft³ per 80 lb bag and round upward after waste.
Bagged Concrete or Ready-Mix?
Bag counts are useful for small pads, post holes, and isolated repairs. As the number of bags grows, compare the labor, mixer capacity, placement time, access, and supplier terms against ready-mix delivery.
The optional pricing section compares supply cost only. Ready-mix suppliers may apply minimum orders, short-load charges, delivery limits, waiting time, and pumping fees. Bagged products also vary by yield and local price, so verify both the package label and supplier quote.
Common Footing Estimate Errors
The most common mistakes are using trench depth instead of concrete thickness, forgetting repeated pads or piers, entering outside dimensions instead of the inside form dimensions, assuming every bag has the same yield, and rounding bags before waste is added.
For round holes, the optional post deduction reduces volume only when enabled. Do not deduct reinforcing steel, small anchor hardware, or minor embedded items; their displacement is usually insignificant compared with excavation uncertainty.
Related Calculators
Code & Source Notes
- QUIKRETE Concrete Mix technical data lists approximate mixed yields of 0.30 ft³ for 40 lb, 0.375 ft³ for 50 lb, 0.45 ft³ for 60 lb, and 0.60 ft³ for 80 lb bags. Product-specific yields can differ, so use the package label when available.QUIKRETE Concrete Mix No. 1101 Technical Data
- Residential footing dimensions and frost protection are governed by the code adopted by the local jurisdiction and the project conditions. This calculator therefore requires the user to supply the approved dimensions rather than generating structural sizes.IRC R403.1 - General (Footings)
After You Size the Footing
Footing volume is the first number of the foundation stage. The usual order from here:
Footings support slabs, posts, and walls. Browse the construction calculator collection for all concrete tools.